All Categories
bess x5li-0

BESS Container

Home >  Products >  BESS Container

BESS+ X5Li

The "Containerized Battery Energy Storage System (BESS)" we developed is an extremely safe and efficient device that can participate in the frequency regulation (FFR) led by TSO (transmission grid operator), can achieve 24/7 green electricity supply to industrial parks, and can also smooth the duck curve of photovoltaic power plants. With more and more applications, more application scenarios will emerge.

Description

Safety and Reliable 

•  The electrical cabinet and battery cabinet are separated to prevent thermal runaway.

•  Three-level fire safety design, precise rescue, prevent fire from happening and spreading.

•  Electrical safety management, overcurrent accelerated fusing.

 

Efficient and Flexible 

•  Function test in factory, limited on-site work, accelerate commissioning process.

•  Front single-door-open design, supporting back to back layout drawing.

•  High-efficiency heat dissipation, increase battery life and system discharge capacity.

 

Optimal Cost

•  Pre-assembled, no battery module handling on site, transportation of complete system

•  Intelligent liquid-cooled temperature control system to optimize the auxiliary power consumption

 

Convenient O&M

•  One-click system upgrade

•  Online intelligent monitoring

 

Specifications and Parameters:

 

MODEL ID

BESS+X5Li

DC side

 

Cell type

LFP 3.2 v / 314 Ah

Nominal voltage range

1123.2 ~ 1497.6 v

Nominal capacity

5015 kWh

System battery configuration

416S12P

AC side(on-Grid)

 

Nominal AC power

210 kVA

Nominal AC voltage

690 v

AC Voltage range

621 ~ 759 v

Nominal frequency

50 Hz

Termination

352 A*3 Phase*6

Power factor

>0.99 (Nominal power)

Adjustable range of reactive power

-100%~100%

System parameter

 

Temperature control method

Intelligent liquid cooling

Max. operating altitude

3000 m

Degree of protection

IP55

Dimensions ( W * H * D

6058 mm * 2438 mm * 2896 mm

Weight

43000 kg

Anti-corrosion degree

C3 (Optional)

Standard

EN 54-5, EN 12094-3, EN 15276, EN550014, EN 60947-5-1, EN12259-1, EN 50270, EN IEC 61000, EN IEC 61326, UN 38.3

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Application Scenarios:
>>Solar Self-Consumption Optimization
Stores excess solar power for use at night or during cloudy days, reducing grid reliance
>>Backup Power During Outages
Critical in areas with unreliable grids or extreme weather
>>Time-of-Use (TOU) Bill Management
Charges batteries during low-cost off-peak hours and discharges during expensive peak times.
>>Grid Services & Virtual Power Plants (VPPs)
Aggregated home batteries provide grid stability services.
>>Off-Grid & Energy Independence
Used in remote areas or by homeowners seeking full energy autonomy (often paired with solar/wind).
 
Frequently Asked Questions (FAQ):
Q: Which battery cells are your ESS adopted?
A:Our battery cells primarily use LFP (Lithium Iron Phosphate) chemistry, known for its safety, long cycle life, and cost-effectiveness, making it ideal for home energy storage applications. However, specific product lines may vary based on regional requirements or customer needs.
Q: What are the advantages of LFP batteries?
A:LFP (Lithium Iron Phosphate) batteries offer several key advantages, making them a top choice for our solutions:
>>Safety
Exceptional thermal/chemical stability; resistant to overheating or thermal runaway (critical for residential use).
>>Long Cycle Life
Typically 6,000+ charge/discharge cycles (vs. 1,000–2,000 for NCM), ensuring 10+ years of service.
>>Cost-Effectiveness
Lower raw material costs (no cobalt/nickel) and longer lifespan reduce long-term expenses.
>>Eco-Friendly
Non-toxic materials and easier recyclability compared to other batteries.
>>Performance
Stable power output even at low charge levels, ideal for daily solar self-consumption.
Q: What is the lead time for a standard battery ESS order?
A: The lead time typically ranges from 2 to 4 weeks, depending on the order quantity and placement date.
Q: What is the lead time for a custom battery ESS order?
A: The lead time typically ranges from 4 to 8 weeks, depending on the complexity and size of the requirement.Q: How long can the EES keep devices running?
A practical example:
A 1,000 Watt microwave oven running for one hour at maximum power will consume 1.0 kWh. The same is true for a 10 Watt LED bulb when lit for 100 hours. So a fully charged ESS+ energy storage system of 1.0 kWh will be able to run the above mentioned microwave oven for 9.5 hours and the LED bulb will be able to burn for 95 hours given 5% SOC left.
                                                          
Contact Us:
Ready to transform your life with our ESS solutions? Contact us today for a free consultation and quote. Our team of experts is here to assist you every step of the way.
Phone: +86 536 2112566
Empower your life with our state-of-the-art lithium energy storage system – where innovation meets cutting edge technology.

 

                                                                        

 

Recommended Products

Contact Us

Our representative will contact you soon.
Email
Mobile/WhatsApp
Name
Company Name
Message
0/1000